Reconstruction of the objects and signal and security technology in the institution for serving a custodial sentence, Dubnica nad Váhom
Project start: 2/2016
Project end: 12/2017
Project budget: 4 862 105 € excl. VAT
Reconstruction of the objects and signal and security technology in the prison consists of the extension of the prison spaces and of the
reconstruction of three existing objects. Old two-storey objects were cleaned into load-bearing masonry. The roof is made of PVC foil,
new slots filling were supplied. Complete internal electrical
installations, plumbing, central heating, gas, water and sewer connections were implemented. Buildings were insulated with polystyrene 160 mm thick.
Part
of the reconstruction is the construction of a new protective concrete wall
(fencing) to a height of 6m with new buildings – watchtowers. The complex is connected to all
utilities. The reconstruction will increase the total capacity of the institute
by 172 beds.
Contact: GR ZJaVS, Šagátova 1, Bratislava
tel.: mjr. Ing. Peter Kiripolský - 02/208 31 505