Finishing the MTS Krivá complex – Second phase New building of the object AB3 and construction work related to the object Production hall 3


Project start:      09/2020

Project end:        12/2021

Project budget:  3 252 348 € excl. VAT

      Administration building AB3 is located directly in the MTS Krivá complex. The buiding is interconnected with AB2 and building H3. Construction foundation system is spatial ferro-concrete skeleton. The roof is designed as flat, green passive roof Optigrereen. Facade is based on aluminium fasade system.